Manchester Tram Incident Report Released

It’s rare that a tram collides with anyone thankfully, but when such an incident occurs there is an investigation to see if safety can be improved. Here’s a report from the UK Govt press office on an incident in Manchester last year;

At 19:25 hrs on Wednesday 1 September 2021, a child riding a bicycle was involved in a collision with a tram on the Metrolink system in Manchester. The collision occurred at a signal-controlled pedestrian crossing located at the junction of Droylsden Road and Kershaw Lane. The tram was travelling westbound, on a journey from Ashton-under-Lyne towards Manchester city centre. The cyclist suffered serious injuries in the collision.

The cyclist had been waiting at a pedestrian refuge positioned in Droylsden Road. The positioning of this refuge is unusual; despite being located mid-carriageway, users still need to be aware that traffic may approach from either direction when making a decision to cross. RAIB’s investigation concluded that the cyclist, who did not await the Puffin crossing indication that the road was safe to cross, was probably focused on eastbound road traffic and he may have been unaware of the westbound tram’s approach at the moment when he stepped from the pedestrian refuge.

An underlying factor was that the risk assessment processes applied during the design, construction and opening of the East Manchester Line did not identify the hazard to pedestrians created by the crossing layout until the tramway construction was advanced to a point where the design could not be easily changed.

Recommendations

RAIB has made five recommendations. The first is that Transport for Greater Manchester (TfGM) and Tameside Metropolitan Borough Council (TMBC) should review the layout of the crossing in light of this accident. The second recommendation is that TfGM should review its safety management system to ensure that adequate processes are in place, both within TfGM and within contractors employed by TfGM, to identify hazards and control risks at the design stage of tramway projects.

The third recommendation is that the Light Rail Safety and Standards Board (LRSSB) review the application of road safety audits as a means to identify and mitigate hazards during tramway development and construction projects. The fourth recommendation is that Keolis Amey Metrolink (KAM) should review the operational risk assessments covering the operation of trams across the Metrolink network for completeness and adequacy.

The fifth recommendation is that TfGM and KAM review the reliability, operation and maintenance of the sanding systems and CCTV systems on M5000 trams.

RAIB also identified a learning point, which reminds duty holders of the importance of ensuring the transfer of corporate memory, including documentation and records, during organisational change.

About alastair walker 13482 Articles
20 years experience as a journalist and magazine editor. I'm your contact for press releases, events, news and commercial opportunities at Insurance-Edge.Net

Be the first to comment

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.